Back to News

Hyas Point Construction Update September 2025

A little weather, a lot of progress: concrete pours wind down as framing pushes upward.

In September, we encountered our first weather challenges in a very long time! While some concrete pours had to jump around in schedule due to rain, we remain on track and continue blazing full speed ahead. Concrete was the big driver in September with pours happening at different times across multiple buildings and framing following quickly behind. As concrete approaches its end with the final pours for Sitka and Klipsan buildings continuing through October, framing continues to make significant gains, with Broadrock building reaching the very top floor with anticipation of “topping out” that building later this month. October will continue to be all about framing as concrete phases out. We look forward to cooler weather ahead as the buildings take form!

River view at Hyas Point in Washougal Washington

Contact Us