Construction at Hyas Point in November was an exciting one, with the top out of both Cascara (Building D) and Sitka (Building B) taking place. The framing crews are working very hard rain or shine, and the pace has not stopped, as evidenced by the rapid vertical progress. It is very exciting to see these buildings take form and start closing up, which signals the start of interior work. The aim is for Klipsan (Building A) to top out by the end of the year, which is an unbelievable schedule for our framers to top out 4 buildings within 6 months. In the spirit of Thanksgiving, we are so grateful for all our subcontractors, consultants, and partners for all of their hard work, and we look forward to finishing out the year on a high note.